Took some time but here's the result:
Taped to cut down, it was too long
Piece cut out and cross strap cut off by stitches
Cut off about 2 1/2" off front mount end/remove motor mount tab
Sleeved inside tube/ capped outside/slid three pieces of steel rod through all
(notice three welds on top for rods)
cut foot pegs/welded propeg mounts
Taped to cut down, it was too long
Piece cut out and cross strap cut off by stitches
Cut off about 2 1/2" off front mount end/remove motor mount tab
Sleeved inside tube/ capped outside/slid three pieces of steel rod through all
(notice three welds on top for rods)
cut foot pegs/welded propeg mounts