Antec1200X Member Nov 11, 2010 1,301 11 43 43 Fort Nelson B.C Jul 21, 2011 #1 thats what its going to cost me for a new top end(NIB Vito's 240 kit).i sure hope its worth it
S Surfrjag Member Mar 18, 2010 2,760 34 85 chesapeake, va Jul 21, 2011 #2 wait for the la sleeve topends. they are going to be more expensive but a better topend for sure.
Zwiser Member May 25, 2010 1,510 16 80 Harrisburg,PA Jul 21, 2011 #3 Yeah id wait they are 100x better just get shorter reed cage bolts and better acorn nuts
Antec1200X Member Nov 11, 2010 1,301 11 43 43 Fort Nelson B.C Jul 21, 2011 #4 how long is this wait? Edit* for an extra $323 is it worth it? Last edited: Jul 21, 2011
1995blaster New Member Jul 30, 2009 3,291 23 0 Jul 21, 2011 #5 from what i head dude its worth it. They rip and have so much more potentiol the port layout on a vitos is similar to a stock sleeved 240 with triples but the la sleeve is like a different top end all together.
from what i head dude its worth it. They rip and have so much more potentiol the port layout on a vitos is similar to a stock sleeved 240 with triples but the la sleeve is like a different top end all together.